Powering CHIGEE Display via Third-Party Power Managers (e.g., HEX ezCAN)
Short answer: For full functionality (e.g., remote camera access on camera models, LTE features on LTE models, and Parking Monitor), we recommend the factory method: wire the CHIGEE Display power harness directly to the motorcycle battery (+ / −) and to an ACC/ignition sense line exactly as described in the CHIGEE Display user manual. Using a third-party power manager (e.g., HEX ezCAN; similar products include Denali CANsmart, ThunderBox) can work, but misconfiguration or “ignition-only” power may break features that require continuous power after engine-off.
Using a Power Manager (e.g., HEX ezCAN) — Two Proven Ways
Method 1 — ezCAN Only (Switched Accessory Output Powers the Display)
Use when you want an ignition-switched install and don’t need Parking Monitor after key-off.
Wiring (example on ezCAN accessory plug):
ezCAN channel setup (typical):
- Function/profile: Accessory / Ignition-switched
Virtual fuse: 3–5 A (camera/LTE models → aim 5 A)
Soft-start / inrush limiting: ON
Power-off delay: 5–10 s (lets recordings stop cleanly)
Method 2 — Hybrid (Battery Direct + ACC from ezCAN)
Use when you want full features and stable always-on power, but prefer ezCAN to provide the ignition signal.
Wiring:
CHIGEE Red (+12 V main) → battery positive (+) (add a 2–3 A inline fuse near the battery)
CHIGEE Black (GND) → battery negative (−)
CHIGEE Yellow (ACC/IGN) → ezCAN “colored” switched wire (the ignition-switched output)
Do not tie Red and Yellow together in this method. Red stays on the battery; Yellow goes to the ezCAN switched lead.
Important limitations: This method is provided as an example only. Because third-party managers differ, we cannot guarantee that Method 2 will deliver Parking Monitor or remote wake/camera behavior on your motorcycle. Channel logic, sleep timing, and voltage thresholds are manager-specific—confirm with the power-manager vendor before wiring.
What Can Go Wrong (and Typical Fixes)
Display reboots on crank / flicker → increase channel fuse limit; enable soft-start; don’t share with horns/lights/heated gear.
Dashcam stops / file corruption → raise fuse limit; check SD card (U3/V30); add a 5–10 s power-off delay.
Parking Monitor doesn’t trigger → output likely not powered after key-off; use always-on or wire per manual.
Final Recommendations
Prefer manual wiring (Battery + / Battery − / ACC) for guaranteed feature coverage.
-
If using a manager like HEX ezCAN (similar: Denali CANsmart, ThunderBox), choose Method 1 (simple, ignition-switched) or Method 2 (hybrid).
-
Critical: The wiring in this article is illustrative. For Method 2 especially, we cannot assure Parking Monitor or remote camera wake on every bike/manager. Consult the power-manager vendor for your exact model.
-
If unsure about CHIGEE harness connections, follow the CHIGEE Display user manual.
Related Articles
Introduction to Wiring & Power (CHIGEE Display)
Goal: reliable power and ignition-aware behavior (auto-on, Parking Monitor, 4G Live on LTE models). Wires: Red = Battery +, Black = Battery − (Ground), Yellow = ACC/Ignition sense. What each wire does Red (B+): permanent +12 V from the battery (use a ...
CHIGEE Display Does Not Powering On
CHIGEE Displays support multiple power input methods, depending on the model. If your display is not powering on, follow the steps below to identify and resolve the issue. Step 1: Confirm Power Supply First, provide power to the device using any of ...
Compatibility of Chigee Display with BMW Cradle(AIO-5 Play BMW & AIO-6)
Chigee offers two products that can be powered directly through the BMW Nav Prep 5/6 or the BMW ConnectedRide Electric Keyless Mount. Depending on your BMW motorcycle’s model and year, the Chigee Display can: Receive power directly from the cradle ...
Power AIO-6 via USB-C (Pre-Install/Test)
AIO-6 Display can be temporarily powered via the USB-C diagnostic port located on the right side of the device, next to the SD card slot. This can be useful for initial setup or testing before full installation. Important Note: Using USB-C power ...
Manually Update or Downgrade CHIGEE Display (via SD Card)
What you need A reliable microSD card (8–128 GB recommended). Download the correct firmware package for your model. Important Keep the device powered during the update. Do not power off. Do not rename any firmware files. Copy all files from inside ...